Integrated management system
Supports rapid and sustained growth
Case study icon svg Casestudy

Integrated Management System

for GKR Scaffolding

  • Industry sector icon svgConstruction
  • Staff icon svg350
  • Location icon svgKent, London

Background

GKR Scaffolding is a leading provider of safe scaffolding access to some of the leading building contractors in the UK. As the highest risk trade, it’s essential that GKR are on top of all elements of their service. However, after experiencing significant growth, their dependency on spreadsheets was starting to hold them back, and with projects such as the London Shard to manage, it was time to consider a better way of doing things.

Project description

Following a number of strategic analysis sessions, we were able to highlight the key areas of the business that were experiencing the most pain. With this in mind, we went about designing a bespoke modular based system that would tackle these key areas, whilst providing a framework for future growth. The system has now grown to accommodate a considerable part of the business.

Some of its features are

  • Full HR, training and development
  • Pro-active alert system to prompt when important issues are about to happen i.e. Training certificates about to expire
  • Annual leave system
  • Stock management
  • Sales
  • Project management
  • Reporting
  • Timesheets and wages
  • Suppliers
  • Subcontractors
  • Document management with automated alerts when key documents are due to expire
If you have a similar project that you’d like to discuss, please call on 01634 299800 or send an email to get the ball rolling.
Umbraco logo MS SQL Server logo MS Dot Net logo MS Visual Studio logo MS Gold standard logo